Sign In | Join Free | My wpc-board.com
China Guangzhou Cleanroom Construction Co., Ltd. logo
Guangzhou Cleanroom Construction Co., Ltd.
GCC : You All-in-one Cleanroom Construction and Solutions Partner
Verified Supplier

5 Years

Home > Prefab Cleanroom >

ISO Modular Physical and Chemical GMP Cleanroom Biomedical Project Solution

Guangzhou Cleanroom Construction Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

ISO Modular Physical and Chemical GMP Cleanroom Biomedical Project Solution

Brand Name : GCC

Certification : ISO 13485,,ISO 9001,GMP,CE

Place of Origin : China

MOQ : 1

Price : Negotiation

Payment Terms : T/T

Supply Ability : Manufacturer

Delivery Time : 10-14

Packaging Details : Wooden Box

Intsall Report : Provided

Characteristic : Control The Air Cleanliness

Using Field : Workshop

Advantage : Auto Control

Feature : Advanced Design and Engineering

Airflow Control : Positive Pressure

Fire Rating : Class A

Item Name : Medical Cleanroom

Key word : Modular Clean Room

Project : Medical Cleanroom Engineering

Warranty : 1 year

Power Supply : 220V, 50Hz

Contact Now

Medical Cleanroom Engineering

We specialize in providing integrated cleanroom design, construction, and validation services that meet international standards (ISO/GMP) for the pharmaceutical, medical device, biotechnology, and research institute sectors. From gene therapy to sterile manufacturing, from lab R&D to large-scale production, we leverage cutting-edge technology, rigorous quality control, and full life-cycle services to build safe, reliable, and compliant clean environments for you. We ensure product purity, process integrity, and operational efficiency.

Features

1.Compliance First

Strict adherence to China GMP (2010 Revision), EU GMP Annex 1, US FDA cGMP, and ISO 14644 international standards.

Compliance is built into the design from the outset, ensuring smooth audits and certifications by domestic and international regulatory authorities.

2.Modular & Flexible

High-performance metal wall panel modular systems offer robust structure, excellent airtightness, enable rapid installation, and facilitate future modifications, expansions, or relocations.

Flexible layouts tailored to process flows (personnel, material, waste) support various production modes and future technological upgrades.

Parameter

Parameter ISO Class 5 (Class 100) ISO Class 7 (Class 10,000) ISO Class 8 (Class 100,000) Notes
Classification Standard ISO 14644-1 Class 5 ISO 14644-1 Class 7 ISO 14644-1 Class 8 Corresponds to old US FED STD 209E names
Max. Allowable Particles/m³ ≥0.5μm: 3,520 ≥0.5μm: 352,000 ≥0.5μm: 3,520,000 Calculated per ISO standard
≥5.0μm: 29 ≥5.0μm: 2,930 ≥5.0μm: 29,300
Airflow Type Unidirectional (Vertical/Horizontal) Non-Unidirectional Non-Unidirectional Unidirectional flow ensures high cleanliness
Air Changes per Hour (ACH) (Air velocity: 0.45±0.1 m/s) 40-60 20-40 Adjusted based on room function and heat load
Temperature Control 20-24°C (±2°C) 20-24°C (±2°C) 20-24°C (±2°C) Typical setting, customizable
Relative Humidity Control 45%-65% (±5% RH) 45%-65% (±5% RH) 45%-65% (±5% RH) Special processes may have specific requirements
Differential Pressure (Pa) ≥ +10-15 to adjacent areas ≥ +10-15 to adjacent areas ≥ +10-15 to adjacent areas Maintains gradient to prevent cross-contamination
Illuminance (Lux) ≥300 ≥300 ≥300 Work surfaces can have enhanced local lighting
Noise Level (dB(A)) ≤65 ≤65 ≤65 Measured at rest
Typical Applications Aseptic filling, sterility testing, cell therapy Buffer preparation, weighing, non-sterile manufacturing, device assembly

Integrated Engineering Service Advantages
* Phase 1: Consulting & Design
* In-Depth Needs Analysis: Work closely with your production, quality, and R&D teams to thoroughly understand process requirements.
* Concept & Preliminary Design: Provide Process Flow Diagrams (PFDs), room layouts, and people/material flow diagrams.
* Detailed Design: Deliver full construction drawings (HVAC, electrical, plumbing, controls) and 3D BIM models for clash detection to avoid construction conflicts.
* Phase 2: Construction & Management
* EPC (Engineering, Procurement, Construction) Model: Single-point responsibility avoids multi-party disputes and ensures overall control of project schedule, cost, and quality.
* Strict Quality Management System: Full auditing and documentation of materials, workmanship, and milestones.
* Experienced Team: Project managers, engineers, and construction personnel have extensive experience in biopharmaceutical projects.
* Phase 3: Testing & Certification
* IQ/OQ/PQ Services: Provide complete Installation, Operational, and Performance Qualification documentation packages ensuring compliance with GEP and GMP.
* Third-Party Certification: Assist in liaising with accredited third-party testing agencies for authoritative certification and reports.
* Phase 4: Operation & Support
* Training Services: Provide systematic training for your operation and maintenance staff.
* Maintenance: Offer efficient preventive maintenance plans and spare parts support.
* Upgrades & Retrofits: Provide future technology upgrade and facility modification plans based on existing systems.

FAQ
Q1: What is the approximate total investment for building a biopharmaceutical cleanroom?
A: Costs vary significantly based on cleanliness class, area, control precision (temp/RH/pressure), equipment selection (local/imported), and automation level. Typically, an ISO Class 5 (Grade A) area costs much more per square meter than an ISO Class 8 area. We recommend providing initial process requirements for a budgetary estimate.

Q2: How long does the entire project take from design to certification?
A: A mid-size project (500-1000㎡) typically takes 6-12 months. The exact timeline depends on design complexity, approval processes, equipment lead times, and site conditions. We develop a detailed Master Plan and share it with you for full transparency at every step.

Q3: Can your control system integrate data with my existing production equipment (e.g., fillers, lyophilizers)?
A: Absolutely. Our EMS/BMS systems use open protocols (e.g., OPC, Modbus) and have strong integration capabilities to communicate and integrate data with mainstream production equipment, SCADA, and MES systems, enabling a true "Smart Factory."

Q4: How is ongoing compliance ensured during operation?
A: Ongoing compliance relies on three pillars: 1) Reliable Hardware: We provide high-quality, stable infrastructure. 2) Robust Software: The EMS system enables continuous monitoring and data logging. 3) Scientific Management: We help you establish Standard Operating Procedures (SOPs) for gowning, cleaning/disinfection, environmental monitoring, preventive maintenance, and provide relevant training.

Q5: Do you provide validation (IQ/OQ/PQ) documentation services?
A: Yes, this is a core part of our service. We have a dedicated validation team that prepares and executes full validation documentation packages according to GAMP 5 guidelines, ensuring all documents meet GMP regulations and efficiently support your audits.


Product Tags:

GMP cleanroom modular solution

      

prefab cleanroom biomedical project

      

ISO modular cleanroom physical chemical

      
Wholesale ISO Modular Physical and Chemical GMP Cleanroom Biomedical Project Solution from china suppliers

ISO Modular Physical and Chemical GMP Cleanroom Biomedical Project Solution Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Guangzhou Cleanroom Construction Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)